This project was a significant challenge in domestic infrastructure development as it provided an opportunity to build a complete tunnel for the first time in a long while. The Duna Group project includes the construction of the M85 expressway section between Fertőrákos and the Sopron border, incorporating a 780-meter-long twin tunnel through Vienna Hill and the construction of the Sopron NW bypass section of road 8647. The expressway will feature two engineering structures and a grade-separated junction, while road 8647 will have three roundabout junctions, five engineering structures, and a railway crossing.
The construction is progressing in high quality and on schedule, safely managed by Hungarian experts and our specialized machinery. Designing and constructing such a tunnel presents numerous challenges, particularly due to geological uncertainties. Developing the interior installation system also poses challenges, but our teams are performing excellently!