The aim of the development was to upgrade the existing sewage treatment network of Miskolc to tertiary treatment performance. The project involved a complete overhaul of the sewage treatment line.
Key modifications were made besides the complete reconstruction of the wastewater treatment plant during mechanical preliminary purification. Within the bifurcation gate we made a change to motor-driven plan-slide gates, thermal insulation and ventilation of the grid mechanical room, replacement of stormwater drop-sluices with motor-driven ones, and upgrading of grit removal mechanism and driving chains. The pre-treated sewage was transferred to the bifurcation gate I, where two new pumps and frequency converters enhanced efficiency and process control. Both operational and backup primary settlers were renovated, covering architectural and mechanical engineering works.
Other Projects:
In recent years, numerous important water and wastewater treatment projects have been completed in Hungary, contributing to environmental protection and infrastructure development. The work carried out in Kondoros (2013-2014) aimed to increase the capacity and efficiency of the wastewater treatment plant, enabled the integration of new areas and connections into the treatment system. During the same period, we enlarged the joint wastewater treatment plant of Abádszalók and Kunhegyes, enhancing network coverage and treatment capacity. Similar developments took place in Lajosmizse and Szarvas, where the construction of sewage networks and the modernization of wastewater treatment plants were made. Significant investments were also executed in the Tápió coastal region and Kiskunhalas, with the construction of four new wastewater treatment plants and the expansion of the plant in Nagykáta.
These projects widely impacted the affected settlements, contributing to the infrastructural development and environmental protection of local communities.