The new 946-meter long Kalocsa-Paks bridge is Hungary’s 20th Duna bridge and the largest budget bridge construction megaproject of our group. It is the first extradosed bridge structure over the Duna in Hungary, and the largest of its kind. It consists of three structures: left floodplain bridge (220m), main river bridge (440m), and right floodplain bridge (286m).
The bridge cuts the Tolnai Duna Natura 2000 area in two halves, necessitating special measures to protect the surrounding environment. To achieve this, we employed thoughtful designing and special construction technologies: we forwarded the several thousand tons floodplain bridge structures to their place by short-track longitudinal push, and we built the river bridge using formwork travellers and cantilever construction technology.